Anthony Wayne Bridge was built in 1931 and carries Woodville Rd./Clayton Street over the Maumee River in Downton Toledo, Ohio.
Waymark Code: WM198A8
Location: Ohio, United States
Date Posted: 12/23/2023
Published By:Groundspeak Premium Member ScroogieII
Views: 0

5. The ANTHONY WAYNE HIGH LEVEL BRIDGE, a $3,000,000 full suspension-type structure, designed by Waddell and Hardest of New York, connect Broadway, on the West Bank of the Maumee River, with Clark Street, on the east bank. The spans, including the approaches, measure 3,801 feet. Opened for use in October 1931, the bridge was named for the Revolutionary hero who played an important role in opening the Maumee Valley to white settlement. -The Ohio Guide 1940

The Anthony Wayne Bridge, commonly called simply the High Level Bridge, is Toledo's only historic high level bridge, and it is a defining landmark for the city. Toledo has other Maumee River crossings, some of which are historic, but they are low level crossings with movable spans to provide for navigation.

This impressive bridge was constructed in 1931. The superstructure of this bridge was built by the McClintic-Marshall Company, which is the same company that built the Ambassador Bridge in Detroit. Waddell and Hardesty were consulting engineers for the Anthony Wayne Bridge.

The bridge features an attractive tower design. The towers feature various lattice patterns, and some of the structural steel on them is itself latticed. The top and bottom horizontal portions of the tower bracing above the roadway have a slight arch to them. The towers do not have the extremely tall feeling that some suspension bridges have, because of a medium span length coupled with a wide four-lane roadway on this bridge create the illusion of shorter towers. This is unlike the Fort Steuben Bridge, which is also a medium-length suspension span (actually within a foot of being the exact length of the Anthony Wayne Bridge!), but it has a narrow two-lane deck, so the towers look very tall.

The bridge contains a traditional three design of three suspended spans, one between towers, and one at end end next to the towers. The suspender cables for this bridge extend down from the main cable in pairs. Stiffening for the deck of the Anthony Wayne bridge is accomplished via a through plate girder design. The bridge features a Warren deck truss approach span that is located next to each of the end suspended spans. These approach truss spans feature riveted connections, and v-lacing/lattice. Original decorative sidewalk railings are present on the bridge. The pattern of the railing used on the bridge bears a striking resemblance to a standard railing design used in Michigan and Ontario.

ODOT has chosen to rehabilitate the existing historic bridge, rather than demolish and replace Toledo's only monumental-sized historic bridge. The project is slated to begin in 2013. Rehabilitation was the right decision to make, and ODOT deserves to be thanked for making this decision. However, to leave the commentary at that alone without a critical evaluation of the actual scope and method of work in the proposed rehabilitation project for this bridge would be detrimental to other bridge owners who might be exploring what the "best practices" for historic bridge rehabilitation are. The proposed replacement project includes the replacement of significant portions of original bridge material. In particular, the proposed project involves the demolition and replacement the deck truss approach spans with a completely different non-truss structure type, such as pre-stressed concrete box beams. Located directly next to the suspension spans, the deck truss approach spans not only have a major impact on the appearance of the bridge, they are the most historically and technologically significant spans on the bridge aside from the suspended spans. Removal of the deck truss spans will have a dramatic negative effect on the historic integrity of the bridge, reducing the bridge's historic integrity from excellent to perhaps merely fair.

Perhaps the only way it was feasible to continue to have the historic Anthony Wayne Bridge remain a part of Toledo's skyline was to have a rehabilitation with these aggressive alterations. If that truly is the case, then ODOT is right to execute the rehabilitation as proposed. However, a detailed photo-documentation of the bridge conducted in 2011 raises some serious questions as to whether the alterations are needed. The trusses look to be in decent shape. Inspection reports do point to pack rust and section loss, but most of this deterioration appears to be confined to edges and corners, and could probably be repaired. ODOT did comment that there have been problems with the expansion joints on the truss spans, and replacing them will correct this problem. However, HistoricBridges.org suggests that perhaps another way to solve this problem could be found. Different types of expansion bearing and joints are available, and so perhaps a change in design of the expansion system would also correct any problems.-Historic Bridges

This is a very clean aesthetically pleasing bridge. My picture is from the south at Middlegrounds Park and gets as much of the bridge in one view that I came across in Toledo. So many things in this area are named Anthony Wayne, as far north as Detroit which sits in Wayne County, Michigan.
Book: Ohio

Page Number(s) of Excerpt: 333

Year Originally Published: 1940

Visit Instructions:
To log a Visit, please supply an original image of the Waymark.

Search for...
Geocaching.com Google Map
Google Maps
MapQuest
Bing Maps
Nearest Waymarks
Nearest American Guide Series
Nearest Geocaches
Create a scavenger hunt using this waymark as the center point
Recent Visits/Logs:
There are no logs for this waymark yet.