State Street Subway - Chicago, IL
Posted by: Groundspeak Regular Member libbykc
N 41° 52.667 W 087° 37.664
16T E 447913 N 4636397
Known to modern Chicago as a the Red Line, few realize it was originally a project of multiple New Deal agencies.
Waymark Code: WM11W96
Location: Illinois, United States
Date Posted: 12/27/2019
Published By:Groundspeak Premium Member Geojeepsters
Views: 1

The project known as the State Street Subway now makes up the downtown portion of the Chicago Transit Authority Red Line, which transitions to elevated tracks north and south of downtown and connects the city from north to south. Notably, both of the city’s Major League Ballparks are located along the Red Line.

More history from the Living New Deal website:

The State Street subway line was one of two initial subway lines to open in the city of Chicago, IL. Running from north to south, the project began in conjunction with the construction of the Milwaukee-Dearborn subway line and was made possible by both the Public Works Administration (PWA) and the Works Progress Administration (WPA). The subway line has undergone major expansions and alterations since the 1930’s, but it still exists today as a portion of the Chicago Transit Authority (CTA) Red Line subway system.

State Street property owners were the first to call for the State Street Subway, but despite that fact, they were also the first to oppose the original plans. Many of them were up in arms because the initial plans called for them to pay for over half the cost of construction (Hewitt). The plans were revised and eventually approved by Harold Ickes, the director of the PWA, in 1938 (“Chicago’s Initial System of Subways.”). The city of Chicago then applied for one loan and one grant through the WPA and was approved for both (Graham). The first ground for the project was broken on December 17, 1938 and construction continued without major delays (“Digging Starts Today on First Unit of Subway.”). The tunnel for the train was buried deep under the city so that a tunnel boring machine could be used throughout the process, which both expedited and simplified the construction process. Only small portions of the tunnel were dug using the “cut and cover” method. In the fall of 1939, cofferdams were built into the banks of the river with subway tunnels inside. Once this project was completed, a 200-foot long steel and concrete tube was constructed at a South Chicago shipyard, floated up to downtown, lowered into a trench in the riverbed, and then connected to the subway tunnels inside the cofferdams so that the trains could make the journey under the river. The construction of the State Street subway system took nearly 5 years to complete (Graham). By the time it was finished, the tracks ran for five miles and cost $34 million to complete (“Chicago Begins Riding Subway at 12 Tonight”).

On October 16, 1943, celebrations were held throughout Chicago to commemorate the opening of the new State Street subway. On the actual tracks themselves, ten special trains ran along the line unloading passengers between 10:25 am and 10:45 am. Then, at 10:47 am, Chicago Mayor Edward Kelley, cut the ceremonial ribbon (Graham). The trains, however, did not officially open for revenue until October 17, 1943 with the first trains running at 12 am (“Chicago Begins Riding Subway at 12 Tonight”).

The State Street subway line ran independently for several decades, but on February 21, 1993, the CTA officially connected the State Subway Line to the Dan Ryan Branch, forming what is known today as the Red Line (Graham). The State Street Subway line still remains as a part of the Red Line subway system; it consists of nine stops between North/Clybourn and Roosevelt. The State Street Subway originally included an additional stop called Washington, however in 2006 the stop was closed due to the Block 37 Project (Graham). The project, which was highly controversial, built a new shopping mall on block 37 of State Street (Hilkevitch). However, by this time the Lake stop had become independent of the Washington stop, and so most commuters were not grievously affected (Graham).

(visit link)
Project type: Other

Date built or created: 1938-1943

Location: Downtown Chicago

City: Chicago

Condition: Good upkeep with a little wear and tear

Website for additional information: [Web Link]

Visit Instructions:
To help give a different perspective and to better the waymark for future visitors please tell us about your visit and upload a favorite photograph you took of the waymark.

Although visiting this waymark in person is the only thing required of you to receive credit for your visit, taking the time to add this information is greatly appreciated.
Search for...
Geocaching.com Google Map
Google Maps
MapQuest
Bing Maps
Nearest Waymarks
Nearest WPA Projects
Nearest Geocaches
Create a scavenger hunt using this waymark as the center point
Recent Visits/Logs:
There are no logs for this waymark yet.