Klärwerk Strass, Tirol, Austria
Posted by: Groundspeak Premium Member luzzi-reloaded
N 47° 24.187 E 011° 50.143
32T E 713952 N 5253862
Klärwerk Strass, Tirol, Austria
Waymark Code: WME4FX
Location: Tirol, Austria
Date Posted: 04/02/2012
Published By:Groundspeak Regular Member CM-14
Views: 8

[DE]

Die ARA Strass – die zentrale Abwasserreinigungsanlage des Abwasserverbandes Achental-Inntal-Zillertal – wurde in den Jahren 1985/86 als zweistufige Anlage geplant, und im November 1989 in Betrieb genommen.
Technische Daten > (visit link)

[EN]

The ARA Strass - the central wastewater treatment plant the wastewater association Achental Inntal Zillertal - was planned in 1985/86 as a two-stage system, and taken in November in 1989.
Technical Data> (visit link)
What is the capacity of the facility?: 28.270 m3/day

Describe the biological treatment technology used.:
Activated Sludge


How are biosolids (sludge) managed?: composting

What technology is used for disinfection prior to dicharge of treated water?: don't know

Who is the owner/operator fo the facility?: ARA Strass

How is the facility governed?: Gemeinde Strass

What is the website of the WWTP?: [Web Link]

Visit Instructions:
Please post at least 2 original photographs of the site. We would much rather see photos of the plant itself as opposed to the front office, but we also understand that security and site layout may limit your opportunities.
Search for...
Geocaching.com Google Map
Google Maps
MapQuest
Bing Maps
Nearest Waymarks
Nearest Wastewater Treatment Facilities
Nearest Geocaches
Create a scavenger hunt using this waymark as the center point
Recent Visits/Logs:
Date Logged Log  
DNS82 visited Klärwerk Strass, Tirol, Austria 12/22/2013 DNS82 visited it
luzzi-reloaded visited Klärwerk Strass, Tirol, Austria 04/04/2012 luzzi-reloaded visited it

View all visits/logs