"The first project in the chronology of the Channel Tunnel was initiated between 1875 and 1883. Underground surveys are conducted by the engineer Labrousse and geologists Potier and Lapparent.
From 1878, a first well was drilled under the direction of the engineer Ludovic Breton at 90 meters below the ground north of Cap Blanc-Nez, on the territory of Sangatte, and 1,839 meters of horizontal gallery are drilled under the sea (the descent).
Work was stopped in 1883. The facilities were demolished in the 20th century and the well was left open but surrounded by a wall. It is finally filled and closed with a concrete slab towards the beginning of the 21st century, this slab is still visible as well as remnants of walls of the old buildings. "
Sources : The Well
" Le premier projet dans la chronologie du tunnel sous la Manche a été initié entre 1875 et 1883. Des sondages du sous-sol sont menés par l'ingénieur Labrousse et les géologues Potier et de Lapparent.
À partir de 1878, un premier puits est foré sous la direction de l'ingénieur Ludovic Breton à 90 mètres au-dessous du sol au nord du Cap Blanc-Nez, sur le territoire de Sangatte, et 1 839 mètres de galerie horizontale sont percés sous la mer (la descenderie).
Les travaux sont arrêtés en 1883. Les installations sont démolies au XXe siècle et le puits est laissé ouvert mais entouré d'un mur. Il est finalement comblé et obturé d'une dalle en béton vers le début du XXIe siècle, cette dalle est toujours visible ainsi que des restes de murs des anciens bâtiments. "
Sources : Le Puits