Jones Branch Bridge #4 - Appalachian Trail - Erwin, TN
Posted by: Groundspeak Premium Member vhasler
N 36° 06.246 W 082° 24.762
17S E 372840 N 3996418
Fourth bridge encountered northbound on the Appalachian Trail heading out of Erwin, TN. Last one before leaving the Jones Branch bottomland.
Waymark Code: WMN3KA
Location: Tennessee, United States
Date Posted: 12/20/2014
Published By:Groundspeak Premium Member saopaulo1
Views: 1

The 30' x 3' x 15' deck truss, constructed of treated lumber, is the four bridge now reached along the Appalachian Trail when heading northbound out of Erwin, TN - crossing the small Jones Branch stream. The forest is loaded with rhododendron, thus recommend June for a visit for the blooms.

ATC Inventory BR4254
Trail Name: Appalachian Trail

Approximate Length of Bridge: 30

Obstacle: Jones Branch

Trail Type: Earthen/Packed Dirt

Visit Instructions:
Photos are encouraged, but not required.
Search for...
Geocaching.com Google Map
Google Maps
MapQuest
Bing Maps
Nearest Waymarks
Nearest Hiking Path Footbridges
Nearest Geocaches
Create a scavenger hunt using this waymark as the center point
Recent Visits/Logs:
There are no logs for this waymark yet.