The Box Canyon Hydroelectric Project - Ione, WA
Posted by: Groundspeak Premium Member T0SHEA
N 48° 46.789 W 117° 24.620
11U E 469855 N 5403060
This hydroelectric project is the fourth to last hydro project on the Pend Oreille River before it meets the Columbia River.
Waymark Code: WMJHRJ
Location: Washington, United States
Date Posted: 11/21/2013
Published By:Groundspeak Premium Member fi67
Views: 3

Downstream of this project are the Boundary Dam, Seven Mile Dam and Waneta Dam. The Waneta dam is at the confluence of the Pend d'Oreille(the river changes its name as it enters Canada[which would be illegal for the rest of us to do]) and the Columbia. One mile further south the water flows back into the US, having been in Canada for only 20 or so miles.

Completed in 1956 by the Pend Oreille Public Utilities District, this was the first hydroelectric project in the nation to be built by a PUD. Though it impounds a substantial(55 miles long) lake behind it, the Box Canyon Dam is a run-of-the-river project that was built at the exit of a narrow channel commonly known as Box Canyon. The powerhouse has four Kaplan type turbines with "Umbrella" type generators. The project was designed with space for a fifth unit. The powerhouse is a part of the dam, with the water entering at its upper wall, then flowing through the turbines, obviating the need for exterior penstocks.

The first of four turbine-generator unit upgrades was completed in March 2011. The second turbine upgrade is scheduled for completion in 2012, and the third and fourth turbine upgrades will be done in 2013 and 2014. The new turbines are more fish friendly, with four runner blades instead of the original five. More efficient than the 50 plus year old turbines, the upgrade should increase generation capacity by approximately 18 megawatts.

The dam itself is 160 feet wide at the base and 62.4 feet high at the top of the gates. It is capable of supplying a maximum head of water of 46 feet.
Operational: yes

Type of power station: Run-of-the-river

Type of turbine: Kaplan

Operator: Pend Oreille Public Utilities District

Visitor center: yes

Date built: 01/01/1956

Generation capacity: 69 megawatts

Visit Instructions:
For posting a log to an existing waymark, you will need to post a unique picture of the power station. If is not open to the public, please do not enter private property. A picture from the distance is sufficent. If it's possible to enter the machine hall, a picture of it would be nice. Please add some additional informations if possible.
Search for...
Geocaching.com Google Map
Google Maps
MapQuest
Bing Maps
Nearest Waymarks
Nearest Hydroelectric Power Stations
Nearest Geocaches
Create a scavenger hunt using this waymark as the center point
Recent Visits/Logs:
Date Logged Log  
Cool Cow Cachers visited The Box Canyon Hydroelectric Project - Ione, WA 06/19/2016 Cool Cow Cachers visited it

View all visits/logs