I was lucky to find the exact location from where the picture in the postcard was taken, because it's not so obvious. It's behind the market, not far from the main street leading to the bridge, but still a bit far.
Information about the place, taken from Wikipedia (
visit link) :
The original bridge was commissioned by Suleiman the Magnificent in 1557 to replace an older wooden suspension bridge of dubious stability. Construction began in 1557 and took nine years: according to the inscription the bridge was completed in 974 AH, corresponding to the period between July 19, 1566 and July 7, 1567. Little is known of the building of the bridge, and all that has been preserved in writing are memories and legends and the name of the builder, Mimar Hayruddin (student of Mimar Sinan, the Ottoman architect). Charged under pain of death to construct a bridge of such unprecedented dimensions, the architect reportedly prepared for his own funeral on the day the scaffolding was finally removed from the completed structure. Upon its completion it was the widest man-made arch in the world. Certain associated technical issues remain a mystery: how the scaffolding was erected, how the stone was transported from one bank to the other, how the scaffolding remained sound during the long building period. As a result, this bridge can be classed among the greatest architectural works of its time.
According to the 17th century Turkish traveler Evliya Çelebi, the name Mostar itself means "bridge-keeper." As Mostar's economic and administrative importance grew with the growing presence of Ottoman rule, the precarious wooden suspension bridge over the Neretva gorge required replacement. The old bridge on the river: "Was made of wood and hung on chains," wrote the Ottoman geographer Katip Çelebi, and it "swayed so much that people crossing it did so in mortal fear". In 1566, Mimar Hayruddin, a student of the great architect Sinan, designed Stari Most. During the reign of, Suleyman the Magnificent, the bridge, which was said to have cost 300,000 Drams (silver coins) to build, The two-year construction project was supervised by Karagoz Mehmet Bey, Sultan Suleyman's son-in-law and the patron of Mostar's most important mosque complex, called the Hadzi Mehmed Karadzozbeg Mosque.
The bridge, 28 meters long and 20 meters high (90' by 64'), quickly became a wonder in its own time. The famous traveler Evliya Çelebi wrote in the 17th century that: the bridge is like a rainbow arch soaring up to the skies, extending from one cliff to the other. ...I, a poor and miserable slave of Allah, have passed through 16 countries, but I have never seen such a high bridge. It is thrown from rock to rock as high as the sky.
he Old Bridge stood for 427 years, until it was destroyed on 9 November 1993 during the War in Bosnia and Herzegovina. After its destruction a temporary cable bridge was erected in its place.
Responsibility for the destruction of the bridge is attributed to Bosnian Croat artillery fire.[2][3][4] Starting on 8 November 1993 the Croatian Defence Council (HVO) bombarded the bridge. Sarajevo-based newspapers reported that more than sixty shells hit the bridge before it collapsed.[5] After the destruction of the Stari Most, a spokesman for the Croats admitted that they deliberately destroyed it, claiming that it was of strategic importance.[6] Academics have argued that the bridge held little strategic value and that its shelling was an example of deliberate cultural property destruction. Andras Riedlmayer terms the destruction an act of "killing memory", in which evidence of a shared cultural heritage and peaceful co-existence were deliberately destroyed.[5]
Slobodan Praljak, the commander of the Croatian Defence Council, is currently on trial at the ICTY with the prosecution alleging that he ordered the destruction of the bridge, among other charges.[
After the end of the war, plans were raised to reconstruct the bridge. The World Bank, the United Nations Educational, Scientific and Cultural Organization (UNESCO), the Aga Khan Trust for Culture and the World Monuments Fund formed a coalition to oversee the reconstruction of the Stari Most and the historic city centre of Mostar. Additional funding was provided by Italy, the Netherlands, Turkey, Croatia and the Council of Europe Development Bank, as well as the Bosnian government. In October 1998, UNESCO established an international committee of experts to oversee the design and reconstruction work. It was decided to build a bridge as similar as possible to the original, using the same technology and materials. The bridge was built with local materials. Tenelia stone from local quarries was used and Hungarian army divers recovered stones from the original bridge from the river below.[9] Reconstruction commenced on 7 June 2001. The reconstructed bridge was inaugurated on 23 July 2004.