Ann Arbor Library - Pittsfield Branch
Posted by: Groundspeak Regular Member GT.US
N 42° 15.167 W 083° 46.712
17T E 270792 N 4681581
The Ann Arbor District Library has constructed a new branch library on 5.74 acres of land at 2359 Oak Valley Drive in Pittsfield Township. This is an amazing and beautiful library!
Waymark Code: WM2QHP
Location: Michigan, United States
Date Posted: 12/08/2007
Published By:Groundspeak Regular Member Team Min Dawg
Views: 49

Edited From the website:
The Ann Arbor District Library constructed a new branch library on 5.74 acres of vacant land on Oak Valley Drive in Pittsfield Township. The Pittsfield Branch, adjacent to the Ann Arbor Ice Cube arena, is a one-story building of approximately 14,600 square feet.

The new Pittsfield Branch library serves as a community-based learning center that delivers superior customer service, primarily to the residents of the southwest quadrant of Ann Arbor and Pittsfield Township.

While its primary mission is to deliver traditional library services, the facility will also include a casual study area with vending and seating for 24 people and a meeting room for groups up to 100.

The branch houses a new collection, which includes traditional materials such as books, magazines, and DVDs, as well as new formats as they are introduced. The facility also houses a reading room for comfortable, leisurely reading, several quiet study and tutor rooms for patron use, and exhibit space for local artists and organizations.

Electronic resources include 35 computer terminals, 18 of which are located in an Electronic Training classroom.

Other library services include: self-service stations for convenient checkout of library materials and 24-hour material pick-up capabilities, which will offer quick and easy access to reserved library materials.

Both the building itself and the surrounding landscape capitalizes on environmental principles, thereby allowing the overall project to operate more in harmony with the ecosystem and the community in which it serves.

Environmental Considerations:
1. Relationship to Site
The main space of the library faces south to capture the maximum heating benefit from the winter sun and maximum daylight throughout the year. The south wall is designed to admit maximum solar radiation in the winter but to block direct sun in the summer, admitting primarily indirect and reflected light. The north and west sides, those most exposed to winter winds, are service spaces and have minimal windows.

2. Building Cross-section
The high, arching ceiling combined with the roof monitor serves to reinforce the natural tendency of warm air to rise, thus facilitating convective cooling. In the summer, air in the monitor is heated by the sun and is allowed to escape through operating windows on the north side. It is replaced by cooler air entering near the floor on the south side and, to a lesser extent, air entering from under the eave on the nor. In the winter, with the windows closed, the heated air in the monitor is pushed down by ceiling fans. Overhangs block the high angle summer sun but admit the lower angle winter sun.

3. Recycled Content Material
By way of example, the roof and much of the sidewalls are clad with pre-finished steel, made primarily from recycled material. The pre-finishing is with a low VOC content resin. The window frames are fabricated from recycled aluminum, and the carpet is woven with 50% recycled content yarn. The cellulose wall insulation consists of 90% recycled material, and the drywall will be a minimum 50% recycled content.

4. Low Energy Content Material
The masonry for this building is to be burnished concrete masonry units rather than brick. Not only is far less energy consumed in the manufacture of these units than is required for brick, but also they are manufactured less than 50 miles from Ann Arbor, and therefore a relatively small amount of energy is consumed in their transportation to the site.

5. Materials from Renewable Resources
Wood for construction and for the fabrication of furnishings will be from managed forests rather than from old-growth forest trees. For example, cork flooring is made from the bark of the cork tree, which is removed without damaging the tree and subsequently re-grows.

6. Coordinated and Efficient Lighting
The artificial lighting system will be automatically monitored so that it is turned on only when the day lighting is insufficient for comfortable reading. If the day lighting level rises, the lights automatically shut off. A built-in time delay prevents frequent cycling on and off. The light fixtures utilize highly efficient T5Ho lamps with electronic ballasts, and limited accent lighting is low-voltage halogen.

7. Air Quality Management
Most commercial buildings operate with a constant quantity of outside air taken in by the mechanical system whether needed or not for health and/or comfort reasons. The Branch will have sensitive air quality monitoring devices that will modulate the air intake so that the only outside air that is heated or cooled will be what is actually required at any given time.

8. Construction Practices
During construction, wood, plastic, and metal waste will be separated so that it can be recycled, thereby diverting at least 50% of the usual construction waste from the landfill.

Natural Features Enhancement and Management Program
The restoration and management areas include the existing watercourse, Malletts Creek, and wetland. Restoration of these areas will involve selective planting of species native to Southeast Michigan that are more appropriate and better adapted to the site than non-native species. This diverse array of native plant material will also function as wildlife food and shelter, and to attract pollinators to the area. Initial and long-term maintenance will be performed on this site to preserve the quality of the native plant systems and to assess their impact on the watercourse and wetland.

Classification of Library: Public Library (Open to all)

Internet access available: Yes - Library Terminal: Register with Library Clerk to use

Hours of Operation:
Monday 10 a.m. to 9 p.m. Tuesday-Friday 9 a.m. to 9 p.m. Saturday 9 a.m. to 6 p.m. Sunday 12 p.m. to 6 p.m.


Approximate date of opening.: 03/06/2006

Library Website: [Web Link]

Additional Internet Connection Options: Not listed

Visit Instructions:

As a suggestion for your visit log, please make every effort to supply a brief-to-detailed note about your experience at the Waymark. If possible also include an image that was taken when you visited the Waymark. Images can be of yourself, a personal Waymarking signature item or just one of general interest that would be of value to others. Sharing your experience helps promote Waymarking and provides a dynamic history of your adventures.

Search for...
Geocaching.com Google Map
Google Maps
MapQuest
Bing Maps
Nearest Waymarks
Nearest Libraries
Nearest Geocaches
Create a scavenger hunt using this waymark as the center point
Recent Visits/Logs:
There are no logs for this waymark yet.