"In 2017, the SDE 24 embarked on an ambitious project: to develop a new public electromobility service in the Dordogne region.
This project, initially carried out in collaboration with 5 other Energy Syndicates present in the region, now brings together 10 of the 12 departments of Nouvelle-Aquitaine. The goal is to develop an electromobility system compatible from one territory to another and to pool the operation of this new network called “Mobive”.
Roaming agreements have also been signed with various mobility operators to enable other French and European customers to recharge their vehicles and facilitate their transactions.
Today, 151 charging stations for electric and plug-in hybrid vehicles are installed in 113 municipalities in the Dordogne department and more than 850 Mobive stations throughout the Nouvelle-Aquitaine region.
Two vehicles will be able to recharge their batteries simultaneously by connecting to the same terminal in normal charge (duration of eight hours) or in accelerated charge (one hour). The terminals also have a domestic charge for an electric vehicle.
Several possible rates:
- Normal load: 5 kw, 0.033€/min - 5-15 kw, 0.066e€/min - +15 kw, 0.09€/min
- Quick charge: +25 kw, 0.135€/min - 25-40 kw, 0.252€/min - 40-75 kw, 0.319€/min"