Greenbank Road - Smiths Falls Sub, Ottawa, ON
Posted by: lindeye
N 45° 16.747 W 075° 45.103
18T E 441041 N 5014232
A new railroad bridge crossing over Greenbank Road in Barrhaven. Nearest parking is at Village Square Mall (south) or Barrhaven Mall (north).
Waymark Code: WMRYN7
Location: Ontario, Canada
Date Posted: 08/23/2016
Views: 9
From City of Ottawa site: (
Greenbank Road Widening)
An Environmental Study Report was completed in 2006 recommending the widening of Greenbank Rd from Malvern Dr/Foxfield Dr to Cambrian Rd. The proposal included a grade separation structure at the railway so Greenbank Rd travels underneath the railway tracks.
The design process began in 2010. The preliminary design was presented to the public at the Barrhaven Open House in April and September 2012, 2013 and 2014. Construction began Fall 2014 and should be completed Summer 2017. Two lanes of traffic opened July 22, 2016.
The bridge is 2.5km west of the Fallowfield Station on the Smiths Falls Subdivision line.