CS:
Práce zacaly v roce 2014 na konci brezna. Delníci už odstranili puvodní provizorní premostení a provedli terénní úpravy. Ted se pracuje na podperách, které budou držet nový most. „Jsou to betonové základy založené na mikropilotách navrtaných do skalního podloží. Mikropiloty jsou ruzné délky o prumeru do trí set milimetru a vyplnené výztuží a betonovou smesí,“ popsal vedoucí blanenské správy a údržby silnic.

Samotná sedmdesát metru dlouhá ocelová konstrukce se bude montovat až na míste. Stavební firma ji složí ze trí cástí. „Nejdrív bude uložena strední cást a potom z každé strany príjezdové komunikace krajní cásti. Na míste se pak svarí v jeden celek,“ upresnil Miloš Bažant. Soucasne s pracemi na novém moste pokracuje i oprava silnice od križovatky pod Kojálem smerem na Kulírov pres Lipovec k Holštejnu až ke križovatce U kaštanu.

Stavební práce, které prijdou na více než ctyricet milionu korun, se plánují do konce letošního zárí. Stavba mostu je ukoncena a první auta se pres nej projela dne 20.9.2014. Kdo si pamatuje starý vojenský most, muže ocenit tichý prejezd pres nový most.

EN:
Work began in 2014 at the end of March. Workers had removed the original makeshift bridge and perform landscaping. Now he is working on supports that will hold the new bridge. "These are concrete foundation based on micropiles drilled into the bedrock. Micropiles are of varying length with a diameter of three hundred millimeters and filled with rebar and concrete mix, "said chief Blansko management and maintenance of roads.

The mere seventy meters long steel structure will be assembled on the spot. Construction company be lodged in three parts. "First, the central portion will be stored, and then from each side edge portion of the access road. On the site are then welded into a single whole, "said Milos Pheasant. Along with the work on the new bridge continues repairing the road from the junction under Kojál towards Kulírov over Lipovec to Holštejn to the intersection U chestnut.

Construction work, which will come to more than forty million are planned by the end of September. Construction of the bridge is completed and the first car drove past him on 20 September 2014. Who remembers the old military bridge, can appreciate the quiet crossing the new bridge.
Date built or dedicated as indicated on the date stone or plaque.: 1/1/2014

Date stone, plaque location.: side of the bridge

Road, body of water, land feature, etc. that the bridge spans.: Bridge over landslide

Website (if available): Not listed

Parking (safe parking location): Not Listed

Visit Instructions:
Please provide an original picture of the location and some original words regarding your visit.
Search for...
Geocaching.com Google Map
Google Maps
MapQuest
Bing Maps
Nearest Waymarks
Nearest Bridge Date Stones and Plaques
Nearest Geocaches
Create a scavenger hunt using this waymark as the center point
Recent Visits/Logs:
There are no logs for this waymark yet.