Oroville Dam & Edward Hyatt Power Plant - Feather River, California
Posted by: Groundspeak Premium Member DougK
N 39° 32.240 W 121° 29.010
10S E 630320 N 4377505
The Oroville Dam and Powerplant received the ACSE Outstanding Projects and Leaders (OPAL) award a year after it was completed in 1969.
Waymark Code: WMMKF7
Location: California, United States
Date Posted: 10/02/2014
Published By:Groundspeak Premium Member silverquill
Views: 5

The Oroville Dam and hydro-electric plant were built under the supervision of State Engineers Edward Hyatt and A. D. Edmonston. A plaque commemorating these two gentlemen's achievement stands on a post, midway across the dam road. Wikipedia tells the construction history:

In 1951, California State Engineer A.D. Edmonston proposed the Feather River Project, the direct predecessor to the SWP, which included a major dam on the Feather River at Oroville, and aqueducts and pumping plants to transfer stored water to destinations in central and southern California. The proposed project was strongly opposed by voters in Northern California and parts of Southern California that received water from the Colorado River, but was supported by other Southern Californians and San Joaquin Valley farmers. However, major flooding in the 1950s prompted the 1957 passage of an emergency flood-control bill that provided sufficient funding for construction for a dam at Oroville, whether it would be part of the SWP or not. Groundbreaking on the dam site occurred in May 1957 with the relocation of the Western Pacific Railroad tracks that ran through the Feather River canyon. The Burns-Porter Act, which authorized the SWP, was not passed until November 8, 1960 – and only by a slim margin. Engineer Donald Thayer of the DWR was commissioned to design and head construction of Oroville Dam, and the primary work contract was awarded to Oro Dam Constructors Inc., a joint venture led by Oman Construction Co.

Two concrete-lined diversion tunnels, each 4,400 feet (1,300 m) long and 35 feet (11 m) in diameter, were excavated to channel the Feather River around the dam site. One of the tunnels was located at river level and would carry normal water flows, while the second one would only be used during floods. In May 1963, workers poured the last of 252,000 cubic yards (193,000 m3) of concrete that comprised the 128-foot (39 m) high cofferdam, which would protect the construction site from floods. This structure would later serve as an impervious core for the completed dam. With the cofferdam in place, an 11-mile (18 km) rail line was constructed to move earth and rock to the dam site. An average of 120 train cars ran along the line each hour, transporting fill that was mainly excavated from enormous piles of hydraulic mining debris that were washed down by the Feather River after the California Gold Rush.

On December 22, 1964, disaster nearly struck when the Feather River, after days of heavy rain, reached a peak flow of 250,000 cubic feet per second (7,100 m3/s) above the Oroville Dam site. The water rose behind the partially completed embankment dam and nearly overtopped it, while a maximum of 157,000 cubic feet per second (4,400 m3/s) poured from the diversion tunnels. This Christmas flood of 1964 was one of the most disastrous floods on record in Northern California, but the incomplete dam was able to reduce the peak flow of the Feather River by nearly 40 percent, averting massive amounts of damage to the area. Ten months later, four men died in a tragic accident on the construction rail line. On October 7, 1965, two 40-car work trains, one fully loaded and the other empty, collided head-on at a tunnel entrance, igniting 10,000 US gallons (38,000 l) of diesel fuel, completely destroying the two locomotives. The burning fuel from the collision started a forest fire that burned 100 acres (40 ha) before it could be extinguished. The crash delayed construction of the Dam by a week while the train wreckage was being cleaned up.

Oroville Dam was designed to withstand the strongest possible earthquake for the region, and was fitted with hundreds of instruments that serve to measure water pressure and settlement of the earth fill used in its construction, earning it the nickname "the dam that talks back". (It is believed that a MW 5.7 earthquake in the Oroville area in 1975 was caused by induced seismicity from the weight of the Oroville Dam and reservoir itself on a local fault line.) The embankment was finally topped out on October 6, 1967, with the last of 155 million tons (140.6 million t) of material that took over 40,000 train trips to transport. On May 4, 1968 Oroville Dam was officially dedicated by the state of California. Among the notable figures present were Chief Justice (formerly California governor) Earl Warren, Senator Thomas Kuchel, and California Representative Harold T. "Bizz" Johnson. The dedication was accompanied by a week of festivities in nearby Oroville, attended by nearly 50,000 people.

The achievement plaques, mounted on the dam, can be seen in Google Street View.

Location:
Feather River Oroville, California


Type of structure/site: Water Dam and Power Generating Plant

Date of Construction: 1968

Engineering Organization Listing: American Society of Civil Engineers

Primary Web Site: [Web Link]

Secondary Web Site: [Web Link]

Engineer/Architect/Builder etc.: Not listed

Visit Instructions:
The listed coordinates for this waymark must be personally visited.

Please submit at least one ORIGINAL PHOTO of the structure, preferably one showing a different aspect, angle, season, etc. from the original waymark.

Give the DATE of your visit and any comments or additional information that will help other visitors enjoy this site.
Search for...
Geocaching.com Google Map
Google Maps
MapQuest
Bing Maps
Nearest Waymarks
Nearest Engineering Landmarks
Nearest Geocaches
Create a scavenger hunt using this waymark as the center point
Recent Visits/Logs:
There are no logs for this waymark yet.