Trail Bridge, Trail, BC
Posted by: Groundspeak Premium Member T0SHEA
N 49° 05.885 W 117° 42.506
11U E 448285 N 5438600
By the late 1950s traffic on Highway 3B had outgrown the old Trail Bridge, and this one, the new Trail Bridge was completed and put into service.
Waymark Code: WMG24B
Location: British Columbia, Canada
Date Posted: 01/03/2013
Published By:Groundspeak Premium Member lumbricus
Views: 2

This four lane steel arch truss bridge replaces the old, single lane bridge built in 1911, located about 1/2 mile to the south-east. It is constructed of four separate arches resting on concrete piers and footings, each about 250 feet long, giving it a total span of just under 1000 feet. It was opened to traffic in 1957 and dedicated in 1961. Except for the aforementioned disused older Trail Bridge, it is the final crossing of the Columbia River before it enters the United States.
Parking Coordinates:: N 49° 05.967 W 117° 42.295

Date Built: 12/31/1957

Length of Span:
About 1000 feet


www: Not listed

Visit Instructions:
Log your find with a picture of the bridge with yourself or your GPS in the foreground. This shot does not have to be taken "on" the bridge. The shot should show the "truss" structure of the bridge as well.
Search for...
Geocaching.com Google Map
Google Maps
MapQuest
Bing Maps
Nearest Waymarks
Nearest Truss Bridges
Nearest Geocaches
Create a scavenger hunt using this waymark as the center point
Recent Visits/Logs:
There are no logs for this waymark yet.