Schleuse Neuer Hafen - Bremerhaven
Posted by: CA*
N 53° 32.738 E 008° 34.207
32U E 471515 N 5933056
lock between Weser and the port basin "Neuer Hafen" / Schleuse zwischen Weser und dem Neuen Hafen
Waymark Code: WM7G9E
Location: Bremen, Germany
Date Posted: 10/22/2009
Views: 64
The task of the lock is to keep the water level in the port basin independent from the Weser. The water level of the Weser is affected by the tide. Some times a day the level of the Weser is above, some times it's below the level of the port basin.
The lock moves ships between the different elevations. Because of the changing magnitude of the elevation difference the time for one operation varies between 10 and 45 minutes.
The lock serves the flood prevention as well.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Die Schleuse dient dazu, den Wasserstand im Neuen Hafen unabhängig von der Tide der Weser zu regulieren. Zudem ist die Schleuse Bestandteil der Hochwasserschutzes.
Abmessungen:
- nutzbare Länge: 50,00 bzw. 62,50 m
- nutzbare Breite: 14,00 m
- Tiefe: 5,50 bis 6,50 m NN
Nutzung:
- Schleusenzeiten 10 min bis 45 min in Abhängigkeit von Belegung und Wasserstandsdifferenz
- höchster schleusbarer Wasserstand = NN + 2,80 m
- niedrigster schleusbarer Wasserstand = NN - 3,00 m
Waterway Name: Schleusenkanal Neuer Hafen
Connected Points: links the river Weser to the port basin "Neuer Hafen"
Type: Lock
Date Opened: 07/07/2005
Elevation Difference (meters): 4.00
Site Status: Operational
Web Site: [Web Link]
Date Closed (if applicable): Not listed
|
Visit Instructions:
Logs marked as “visits” should be made after physically visiting the waymark location. Include a picture taken during the visit. Notes may be logged by individuals who have visited the web site or looked at the online information and would like to provide comments or feedback on the waymark.