Bowling Green AFS
Information from: (
visit link)
Bowling Green gap filler annex Z-70G was built in 1961 by the Air Force and declared excess in 1968. It was turned over to the GSA and transferred to the National Science Foundation, and eventually sold to private ownership. It was bought and used by Kolb Oil and Tire from 1975 to 1979, when it was sold to a junk dealer who removed the building in 1988/89. The property was sold and is now used as farmland.
Ed. note: based upon the USGS aerial image on the "TerraServer" website and on Mark Morgan's recent photos, it appears that the building actually was not removed, only modified (making recognition difficult).
Visit Instructions:Please post pictures of the sites as they exist now and feel free to share any pictures you may have from when the sites were operational. Access maybe limited permission maybe needed to gain closeup access to some sites or to photograph them.
We will only accept waymarks with supporting data. If you served at the site you can count that as a site visit.
If you served at the site please share some experiences. The following link may help you find information on the sites you visit.
(
visit link)