Alto da Boa Vista - Sao Paulo, Brazil
Posted by: Groundspeak Premium Member saopaulo1
S 23° 38.480 W 046° 41.946
23K E 326689 N 7384450
Estacao Alto da Boa Vista em Sao Paulo.
Waymark Code: WM101K2
Location: São Paulo, Brazil
Date Posted: 02/09/2019
Published By:Groundspeak Premium Member superstein
Views: 1

"A Estação Alto da Boa Vista é uma estação do metrô da cidade brasileira de São Paulo operada pela ViaMobilidade. Pertence à Linha 5–Lilás, que atualmente chegou à estação Chácara Klabin da Linha 2–Verde em 28 de setembro de 2018.

A estação está localizada na Avenida Santo Amaro, próxima a Rua Irineu Marinho e a Rua da Granja Julieta, na Granja Julieta, no distrito de Santo Amaro, na Zona Centro-Sul de São Paulo.

Inicialmente, a previsão de entrega da estação era para o ano de 2014, mas uma suspeita de conluio de empresas vinda da Promotoria acabou suspendendo as obras por 15 meses, gerando o atraso. Por conta disso, a inauguração da estação acabou sendo postergada para 2018. Posteriormente, devido ao adiantamento das obras, o Governador Geraldo Alckmin adiantou a entrega da estação para julho de 2017, fato que não se concretizou, junto com as estações Borba Gato e Brooklin. No dia 6 de Julho de 2017, a Estação Alto da Boa Vista estava em fase de instalação de sistemas elétricos, o que fez como que a data da inauguração passasse para o dia 30 de Agosto de 2017. Porém, em 1 de setembro de 2017, após inúmeros atrasos, o Metrô de SP confirmou oficialmente que a inauguração das estações Alto da Boa Vista, Borba Gato e Brooklin ocorreria dentro de poucos dias. A Estação Alto da Boa Vista foi inaugurada oficialmente em 6 de setembro de 2017. Em 27 de novembro de 2017 passou a funcionar em período integral." (visit link)




Alto da Boa Vista Station is a subway station in the Brazilian city of São Paulo operated by ViaMobilidade. Belongs to Linha 5-Lilás, which currently arrives at Chácara Klabin station of Linha 2-Verde on September 28, 2018.

The station is located at Avenida Santo Amaro, near Irineu Marinho Street and Rua da Granja Julieta, at Granja Julieta, in the district of Santo Amaro, in the Center-South Zone of São Paulo.

Initially, the forecast of delivery of the station was for the year 2014, but a suspicion of collusion of companies coming from the prosecution ended suspending the works for 15 months, generating the delay. As a result, the inauguration of the station was delayed until 2018. Subsequently, due to the advance of the works, Governor Geraldo Alckmin announced the delivery of the station to July 2017, a fact that did not materialize, together with the stations Borba Gato and Brooklin . On July 6, 2017, the Alto da Boa Vista Station was in the phase of installing electrical systems, which meant that the inauguration date was to expire on August 30, 2017. However, on September 1, 2017 , after numerous delays, the SP Subway officially confirmed that the inauguration of Alto da Boa Vista, Borba Gato and Brooklin stations would take place within a few days. The Alto da Boa Vista Station was officially inaugurated on September 6, 2017. On November 27, 2017, it became fully operational.
Is there other puplic transportation in the area?: Yes

What level is the station?: Below street level

Visit Instructions:
You must upload at least two photo's:
A photo of the name of the station.
And a photo of the entrance of the station.
The station must be connected to a metro/subway rail-system.

Search for...
Geocaching.com Google Map
Google Maps
MapQuest
Bing Maps
Nearest Waymarks
Nearest The Underground
Nearest Geocaches
Create a scavenger hunt using this waymark as the center point
Recent Visits/Logs:
There are no logs for this waymark yet.